You've chosen the perfect BBQ pod for your garden, and now it's time to prepare for installation day. While professional installation is included with every BBQ pod purchase, proper site preparation ensures a smooth, efficient setup and decades of reliable performance.
Professional Installation Included
Every BBQ pod arrives 100% fully assembled with professional installation included. Our experienced team handles delivery, positioning, and all utility connections. Most installations are complete within 4-6 hours, and you can start cooking the same evening.
The Concrete Base: Your Foundation for Success
A proper concrete base is the single most important preparation step for your BBQ pod installation. The base provides stable support for your outdoor kitchen, which can weigh between 500-800kg when fully equipped, and ensures proper drainage to protect your investment.
Base Specifications
- Minimum Thickness: 100mm (4 inches) reinforced concrete
- Size: Pod dimensions + 150mm extension on all sides (e.g., for A-Mini at 2210mm × 1002mm, base should be minimum 2510mm × 1302mm)
- Level Tolerance: Within 10mm across entire surface
- Load Capacity: Minimum 500kg/m² bearing capacity
- Drainage: Slight gradient (1:80) away from pod position to prevent water pooling
- Curing Time: Allow 7-14 days for concrete to fully cure before installation
Base Size Calculator by Model
| Model | Pod Dimensions | Minimum Base Size |
|---|---|---|
| A-Mini | 2210mm × 1002mm | 2510mm × 1302mm |
| A-Plus | 2690mm × 1002mm | 2990mm × 1302mm |
| A-Max | 3500mm × 1002mm | 3800mm × 1302mm |
| A-Ultra | 3760mm × 1002mm | 4060mm × 1302mm |
| A-Pro | 3180mm × 1290mm | 3480mm × 1590mm |
Need Help with Base Preparation?
We can recommend trusted local contractors in your area who specialize in outdoor kitchen base preparation. Contact us for referrals and specifications to share with your contractor.
Utility Requirements: Power, Gas & Water
BBQ pods require three main utilities: electricity for lighting and appliances, gas for the grill, and optionally water for sinks and cleaning. All connections must be installed by qualified professionals before installation day.
Electrical Requirements
- Standard 13A UK socket: Standard mains power (same as domestic appliances)
- Location: Within 3 meters of the pod installation site
- Weatherproofing: IP65-rated outdoor socket with protective cover
- Protection: RCD (residual current device) protection strongly recommended
- Circuit: Dedicated circuit breaker preferred (especially for A-Max and larger models with multiple appliances)
- Installation: Must be installed by qualified Part P electrician
The electrical connection powers LED lighting systems, integrated fridges (21-24"), weatherproof TVs (32-42" on A-Plus and A-Max models), audio systems, and the A-Pro's motorised awning. All electrical components in BBQ pods are weather-sealed to commercial standards and designed for permanent outdoor installation.
Gas Requirements
You have two options for gas supply:
Option 1: Mains Gas Connection
- Connection point within 3 meters of pod location
- Must be installed by Gas Safe registered engineer
- Requires outdoor-rated gas meter and isolation valve
- Best for permanent installations with existing mains gas access
Option 2: Propane Tank
- Space required: 600mm diameter for standard 47kg propane bottle
- Location: Within 3 meters of pod, ventilated area, away from ignition sources
- Regulator and hose connections included with pod
- Ideal for properties without mains gas or temporary locations
- 47kg bottle provides approximately 35-40 hours of cooking (depends on grill usage)
Important Gas Safety Note:
All gas connections must comply with UK Gas Safety Regulations and be installed by a Gas Safe registered engineer. Never attempt DIY gas installations.
Water Connection (Optional)
Water connection is optional but recommended, particularly for the A-Pro model which includes a garden hose connection point for easy cleaning:
- Standard garden hose connection (most common setup)
- Within easy reach of the pod for sink use and cleaning
- Drainage consideration: Ensure proper drainage if adding sinks or water features
- Winterization: Disconnectable supply to prevent frost damage in winter
Access Requirements for Delivery
BBQ pods arrive 100% fully assembled on a flatbed delivery truck (similar size to a removal lorry). Our installation team will survey your property before delivery to determine the best positioning method.
Crane Delivery Method
Most suitable for properties with limited garden access or when the installation site is far from vehicle access:
- Requires overhead clearance (typically 8-10 meters for crane operation)
- No overhead cables, tree branches, or other obstructions
- Firm, level ground adjacent to property for crane positioning
- Vehicle access for crane truck (7.5 tonne truck minimum)
- Can position pod over obstacles like walls, fences, or flowerbeds
- Fastest installation method (typically 1-2 hours for positioning)
Wheeled Delivery Method
Suitable for properties with good pedestrian access to the garden:
- Clear path minimum 1.2 meters wide from vehicle to installation site
- Level or gently sloping access (no steps or steep inclines)
- Firm ground throughout the access route
- Gate openings must be minimum 1.3 meters wide
- No sharp turns or tight corners that prevent pod maneuvering
- Takes longer than crane delivery but avoids overhead requirements
Pre-Delivery Site Survey
We offer optional pre-delivery site surveys to assess access options, confirm utility locations, and answer any questions. Our experienced team will recommend the best delivery method for your specific property. This ensures a stress-free installation day with no surprises.
Complete Pre-Installation Checklist
2-3 Weeks Before Installation:
- 1Arrange concrete base preparation (allow 7-14 days curing time)
- 2Contact electrician for outdoor socket installation (Part P certified)
- 3Book Gas Safe engineer for gas connection preparation
- 4Confirm access route is clear (trim overhanging branches, move obstacles)
1 Week Before Installation:
- 5Verify concrete base is fully cured and level
- 6Test electrical socket with RCD protection
- 7Confirm gas supply is live and certified (or propane tank space is prepared)
- 8Clear installation area of garden furniture, planters, and debris
Installation Day:
- 9Ensure clear vehicle access to property
- 10Have utility locations clearly marked or accessible
- 11Be available for final positioning confirmation and walkthrough
- 12Prepare for handover documentation and feature demonstration
Common Preparation Mistakes to Avoid
❌ Installing pod on paving slabs or gravel
While tempting, paving slabs can shift over time causing pod to become unlevel. Always use properly reinforced concrete base.
❌ Utilities more than 3 meters away
Extended cable or pipe runs can cause pressure drops and safety issues. Plan utility positions within 3 meters of pod location.
❌ Not allowing concrete to fully cure
Installing on uncured concrete (less than 7 days) can cause cracking and settlement. Wait the full curing period.
❌ Forgetting about drainage
Water pooling around your pod can damage the base and create slip hazards. Ensure proper gradient and drainage channels.
❌ Using non-outdoor rated electrical sockets
Indoor sockets will fail quickly outdoors. Always install IP65-rated weatherproof outdoor sockets with RCD protection.
What Happens on Installation Day?
With proper preparation complete, installation day is straightforward and exciting. Here's what to expect:
Delivery Arrival (9am-10am)
Professional team arrives with your fully assembled pod on flatbed truck. Pre-delivery site check and positioning confirmation.
Pod Positioning (10am-12pm)
Using crane or wheeled system, pod is carefully positioned on your prepared base. Final alignment and leveling adjustments made.
Utility Connections (12pm-3pm)
Professional installation of all electrical, gas, and water connections. Safety testing and system checks completed.
Commissioning & Handover (3pm-4pm)
Full demonstration of all features, appliance operation, and maintenance guidance. Handover documentation and warranty information provided.
Ready to Cook! (Evening)
Your BBQ pod is fully operational and ready for your first meal the same evening. Enjoy your new outdoor kitchen!
Frequently Asked Questions
Can I DIY the concrete base?
Yes, if you have concrete laying experience. However, we recommend using a professional contractor to ensure the base meets all specifications (100mm thickness, proper reinforcement, correct drainage gradient). A poorly prepared base can cause long-term problems. We can recommend local contractors if needed.
What if I can't get mains gas to my garden?
Propane tanks are a perfectly viable alternative to mains gas. A standard 47kg propane bottle provides 35-40 hours of cooking and can be easily exchanged when empty. Many of our customers prefer propane for flexibility and installation simplicity.
How far in advance should I start preparation?
We recommend starting preparation 3-4 weeks before your planned installation date. This allows time for concrete base installation (1-2 days work + 7-14 days curing), utility installations (1-2 days each for electrical and gas), and any unexpected delays with contractor scheduling.
What if my garden has difficult access?
Crane delivery can overcome most access challenges, positioning pods over walls, fences, and other obstacles. Our pre-delivery site survey will assess your specific situation and recommend the best approach. We've successfully installed BBQ pods in challenging locations including terraced houses, gated communities, and properties with limited vehicle access.
Get Expert Installation Support
Proper preparation ensures your BBQ pod installation goes smoothly and your outdoor kitchen performs perfectly for decades. Our experienced team is here to guide you through every step of the process, from initial planning to final commissioning.
For detailed installation specifications, contractor recommendations, or to arrange a pre-delivery site survey, contact our team. We're here to make your BBQ pod installation as stress-free as possible.