
BBQ Pod Installation Guide
Professional same-day installation included with every BBQ pod. Fully assembled delivery, utility connections, and commissioning — you start cooking immediately.
Fully Assembled
Arrives 100% pre-assembled. No DIY, no stress, no tools required.
Same-Day Setup
Complete installation in 4-6 hours. Cooking by evening!
Professional Team
Experienced installers, fully insured, Gas Safe registered.
UK Nationwide
Professional installation available across all UK regions.
Installation Timeline
From site preparation to first cook — here's what to expect
1. Site Survey (Optional)
30-60 minutesWe can arrange a pre-installation site survey to assess access, utilities, and answer questions.
2. Base Preparation
1-2 daysPrepare your concrete base (DIY or we can recommend contractors). Must be level and properly drained.
3. Delivery Day
2-3 hoursYour fully assembled pod arrives on a flatbed truck. Our team cranes or wheels it into position.
4. Utility Connections
2-3 hoursProfessional installation of all gas, electric, and water connections. Safety testing completed.
5. Commissioning
30 minutesFull demonstration of features, appliance testing, handover documentation. Start cooking immediately!
Installation Requirements
Everything you need to prepare for your BBQ pod installation
Base Requirements
- Level concrete base (minimum 100mm thick)
- Extends 150mm beyond pod dimensions
- Level tolerance: within 10mm
- Proper drainage to prevent water pooling
- Load-bearing capacity: 500kg/m²
Electrical Requirements
- Standard 13A UK mains socket
- Within 3 meters of pod location
- RCD protection recommended
- Weatherproof outdoor socket (IP65 rated)
- Connected to dedicated circuit breaker
Gas Requirements
- Mains gas connection OR propane tank space
- Gas safe registered installer required
- Within 3 meters of pod location
- Propane: space for 47kg bottle (600mm diameter)
- All connections must meet UK Gas Safety Regulations
Access Requirements
- Vehicle access for flatbed delivery truck
- Overhead clearance for crane (if required)
- Clear path to installation site (1.2m width minimum)
- No overhanging trees or power lines
- Firm ground for vehicle positioning
Need Help with Site Preparation?
We can recommend trusted local contractors for base preparation, utility installation, and landscaping work. Contact us for recommendations in your area.
Get Expert AdviceInstallation FAQs
How long does BBQ pod installation take?
Professional installation is typically completed in a single day. Your BBQ pod arrives fully assembled, so our team just needs to position it and connect utilities (gas, electric, water). Most installations are complete within 4-6 hours, and you can start cooking immediately after commissioning.
What base do I need for a BBQ pod?
You need a level concrete base (minimum 100mm thick) that extends at least 150mm beyond the pod dimensions on all sides. The base must:
- Be level within 10mm tolerance
- Have proper drainage to prevent water pooling
- Have load-bearing capacity of at least 500kg/m²
- Be fully cured before installation day
We can recommend local contractors if you need base preparation services.
What utilities are required?
Standard requirements include:
- Electrical: 13A socket (standard UK mains) within 3 meters
- Gas: Mains gas connection OR space for propane tank (47kg bottle, 600mm diameter)
- Water (optional): Garden hose connection for sinks and cleaning
All connections must be installed by qualified professionals (Gas Safe registered for gas work).
Is professional installation included in the price?
Yes, professional installation is included with every BBQ pod purchase. Our experienced team delivers your fully assembled pod and completes all utility connections in a single visit. We provide nationwide coverage across the UK with no hidden fees for standard installations.
Do I need any special access for delivery?
We need vehicle access for a flatbed truck (similar to a removal lorry). Depending on your site:
- Crane delivery: Requires overhead clearance and firm ground for crane positioning
- Wheeled delivery: Requires clear path at least 1.2m wide with no steps
Our team will survey your site before delivery to determine the best method and ensure smooth installation.
What happens on installation day?
On installation day, our team will:
- Arrive with your fully assembled BBQ pod on a flatbed truck
- Position the pod on your prepared base using crane or wheeled system
- Connect all utilities (gas, electric, water if applicable)
- Test all appliances and safety systems
- Provide full demonstration of features and maintenance requirements
- Complete handover documentation
You'll be ready to cook your first meal the same evening!
Do I need planning permission?
In most cases, no planning permission is required as BBQ pods typically fall under permitted development rights for garden structures. However, regulations vary by location and property type.
Ready to Transform Your Garden?
Professional installation included. Same-day setup. Cooking by evening. Get your personalised quote today.
